This Content Is Only For Subscribers
The first test ride of the Looping Rocket hydroslide has marked a thrilling milestone at Christchurch’s Parakiore Recreation and Sport Centre, as installation of the facility’s five eel-inspired slides nears completion.
To use the country’s only trapdoor hydroslide, riders step into a launch chamber, watch the door close, and brace for a short countdown before the floor drops away—sending them down a 75-metre-long tube at speeds of up to 40km/h.
The test run was carried out by hydroslide installers Swimplex Aquatics as part of the process to calibrate water flow rates, ensuring riders reach the end safely. The other four slides have also been tested ahead of public opening.
Crown Infrastructure delivery project director Alistair Young says the successful testing is a major step forward.
“These slides are not only technically impressive, they’re a symbol of the fun and energy Parakiore will bring to the city. Testing ensures every ride is thrilling and safe, and it’s exciting to see this part of the facility come to life.”
The hydroslides are a standout feature of the 32,000m² indoor sports and aquatics facility. Ranging in height from nine to twelve metres and made up of around 800 fibreglass sections, some of which are translucent, allowing those lining up to see other riders zooming past.
Designed in collaboration with Matapopore, the slides resemble silver-bellied eels in an eel pot. Alistair says the colour scheme will make the entrance to Parakiore instantly recognisable as Christchurch.
“These slides aren’t just fun, they’re meaningful. They reflect local stories and values in a way that’s authentic and exciting.”
The hydroslide tower includes five distinct experiences:
• The Looping Rocket trapdoor slide for thrill-seekers, standing 12 metres high.
• The Sphere Slide, where up to two riders on a raft spin unpredictably in a large sphere, also launching from the 12-metre platform.
• Two additional body slides offering varied speeds and turns for all ages from the nine-metre platform.
• A gentler slide from the nine-metre platform for less confident riders.
Together, the slides will cater for up to 300 riders at a time, significantly expanding Christchurch’s capacity for aquatic fun.
Over in the 50-metre competition pool, installation of the 17 by 25-metre moveable floor has also been completed. This adjustable feature can be set anywhere from zero to 2.2 metres deep, allowing the pool depth to be tailored for different uses, from elite training to community swimming, aquajogging or learn-to-swim lessons, enhancing the versatility of New Zealand’s largest indoor aquatics facility.
Parakiore Recreation and Sport Centre is being delivered by Crown Infrastructure Delivery and built by CPB Contractors. It will be owned and operated by Christchurch City Council and is expected to open in late 2025.